Generate Your Schedule
Maintenance Reference
| Component | Interval | Typical Action |
|---|---|---|
| Gibs & Slides | Weekly | Check clearance, lubricate |
| Encoder Battery | Annual | Replace regardless of voltage |
| Servo Motor | Quarterly | Check vibration, clean vents |
| Hydraulic Oil | 6 months | Sample analysis, filter change |
| Ball Screw | Monthly | Grease, check backlash |
| Brake System | Weekly | Function test, pad wear check |
| Cooling System | Monthly | Clean filters, check flow rate |
Maintenance Tips
Predictive vs Preventive: Use vibration monitoring and oil analysis to shift from time-based to condition-based maintenance.
Downtime Cost: Unplanned stops cost 3–5x more than scheduled maintenance. Track MTBF to optimize intervals.
Spare Parts: Keep encoder batteries, brake pads, filters, and O-rings in stock. Lead time on servo motors can be 8–12 weeks.
Documentation: Log every maintenance action with date, technician, and findings. Export CSV for record keeping.