Add to the checklist: verify all safety functions BEFORE running any production. I mean actually test every light curtain, every interlock, every e-stop. Not just check that they're installed —trigger each one and verify the press stops. We found a miswired interlock on a brand new press during commissioning. Could have been a serious incident.