Operator shortcut that actually works: after changing the die, run 5 strokes at reduced speed (10 SPM) with no material. Watch the tonnage monitor —it should show near-zero force. If you see any force reading, the shut height is too low and the die is touching. Adjust up 0.1mm at a time until the force reading is zero, then load material.