Leveling is critical and often rushed. Use precision machinist levels (0.02mm/m sensitivity) on the bolster surface, not a carpenter's level. Check in both X and Y directions. Re-check after 1 month of production —the foundation settles slightly under dynamic load and you'll need to re-shim.